Country: Tanzania
Location:Arkatani village in Munduli district- Arusha
Professional Staff provided by our Organization:The Nelson Mandela African Institution of Science and Technology (NM-AIST)
Name of Client: Tanzania Commission for Science and Technology (COSTECH)
Start Date: October 2015 Completion date: September 2017
Narrative Description of Project:
High turbidity water is a great challenge to availability of safe water in many plcaes. High turbidity water is a common feature in the lowlands of Arusha where water scarcity is also common. In Monduli where communities depend on dam water as their source of water, water is highly turbid (˃1000 (NTU) throughout the year. People are forced to either use this nauseating water for drinking exposing themselves to health risks or walk long distances to get cleaner water thus wasting valuable production time. Settling tank coupled with Inclined Plate Settler (IPS) has been developed and tested in NM-AIST laboratories and has shown to be feasible and effective in reducing the ever turbid waters of the Monduli earthen dams to within the Tanzania drinking water standards.
The overall objective of this project, therefore, is to validate the innovative technology of combining settling tanks with IPS to treat highly turbid water to produce potable water to rural communities. The project shall design and construct a pilot scale IPS at Arkatan village in Monduli district- Arusha, monitor and evaluate the performance of the pilot scale IPS in order to determine its efficiency in field environment. The project area is inhabited mostly by the nomadic (Maasai) communities and has challenges with availability of water.
Services Provided by ENVICON:-
- Conduct review/analysis of relevant internal and external documents ;
- Prepare inception report;
- Develop appropriate tools and methodology for data collection to be used in formative research
- Carry out field survey for data collection in Sinyanga and Arusha;
- Prepare field report highlighting preliminary results of key findings;
- Compile full report outlining findings and key recommendations/strategies
- Organize validation workshops for sharing key findings and recommendations;
- Prepare OHS tools, guidelines and training materials to be used by the programme;
- Conduct training to selected stakeholders in Shinyanga and Arusha;
- Prepare workshop reports.